Garages, Workshops and Outbuildings in Central Pennsylvania

Our Services

Detached garages, pole buildings, workshops and storage, built on a real foundation.

Goodridge Construction Group builds garages, workshops, pole buildings and storage buildings across Columbia, Montour, Luzerne, Union and Northumberland counties. Site work, foundation, structure, roof, siding, doors, electrical and concrete floor, all under one contract.

These get treated as simple buildings and they are not. The floor has to carry vehicles or equipment, the footings have to go below frost depth, the township has setback and lot coverage rules, and if you want power out there somebody has to get a circuit from the house to the building legally. Kit buildings dropped on a thin slab are the ones we get called out to fix.

A crane lowers roof trusses on a framing project, highlighting expert craftsmanship in new construction services, home addition services, and garage construction services.

Detached Garages

Detached garages built to last

One, two and three bay detached garages, with or without a second floor. The most common outbuilding we build and the one where the slab matters most.

What a detached garage includes:

Workshops and pole buildings

Pole construction is the right answer when you need span and height for the money: equipment storage, a shop, a hobby space or farm use.

What we build:

Attached garages and garage additions

Adding a garage onto an existing house is an addition with a vehicle in it, and it carries the same structural and zoning questions as any other home addition.

What this involves:

Sheds, barns and storage buildings

Smaller buildings still need a base that does not move and a plan for drainage.

Also built:

The Floor and the Footings Are the Whole Job

Nobody photographs the slab, and the slab is what you are actually buying. A garage floor that was poured too thin cracks under a vehicle in three winters. Footings above frost depth lift the whole building. We build the base for what is going in it, we pull the permit, and we deal with the township on setbacks before you order a building rather than after.